Surface Mining
Baboto–Gounkoto Complex
Barrick Gold
Gold
January 2018
Active
Client
Barrick Gold
Operation Type
Surface Mining
Commodity
Gold
Status
Active
Start Date
January 2018
What We Deliver
Comprehensive surface mining operations at Baboto Gold Project, providing Load & Haul, Production Drilling, Dewatering, Management, and Technical Services to Barrick Gold.
Services Provided
Load & Haul
Production Drilling
Dewatering
Management
Technical Services
Project Gallery
1 / 1
Production Statistics
Yearly production performance and key operational metrics
| Year | BCM Mined (m³) | Ore Mined (t) | Waste Mined (t) | Metres Drilled (m) |
|---|---|---|---|---|
| 2024 | 4,782,580 | 1,298,577 | 5,651,614 | 2,432 |
| 2025Latest | 391,693 | 108,262 | 475,784 | 0 |
All production figures are cumulative for the respective year. Latest year is highlighted in orange.
Join This Project
2 positions
Explore More
Discover our operations across Africa